top of page

Enhancing JSW Utkal’s Energy Infrastructure with a 700 MW Thermal Revamp

JSW Energy Utkal Limited

Enhancing JSW Utkal’s Energy Infrastructure with a 700 MW Thermal Revamp

JSW Energy Utkal Limited

Duration

26 months

Scale

2 units × 350 MW total capacity

Scope

Comprehensive revamp and erection of two 350 MW thermal power units, covering boiler systems and balance of plant (BOP) components.

Year

700 MW

Location

Jharsuguda, Odisha

Industry Sector

Thermal Power Generation

Client

​

Access Full Project Details.

See Work Completion Certificate.

View Certificate

Client Testimonials

What Clients Share

GIMS Energy has been a dependable partner in driving excellence in safety and operations at our Barmer plant. Their team’s resilience, dedication, and effective implementation of OHS systems contributed to us achieving the prestigious British Safety Council’s Five Star Rating. Their commitment makes them an indispensable ally in creating safe, reliable, and high-performing power operations.

Veeresh Devaramani

Head of Plant, JSW Energy (Barmer) Ltd.

freepik_ultrarealistic-169-cinema_2829416514.png

Does Your Business Need Something Similar?

Explore Similar Projects

Explore All Projects

Share via

freepik__energy-command-center-with-wide-wall-of-screens-sh__83124.png
freepik__hightech-control-and-rd-space-with-physical-equipm__83123.png
bottom of page